fonderia 1
Genesi

Securing the roofs of the plant with special attention to the maintenance of the photovoltaic system.

Verona

Plant: railings, walkways, tracks

Genesi was selected to secure the roofs used for photovoltaic plant and overhead crane machinery inside the production plant.

Installed on the roofs were: ladders with integrated track for roof access and overhead walkways using collective protection systems such as guardrails, integrated with individual protection systems such as tracked lifelines.

Inside the plant, the client needed to secure operators engaged on routine and extraordinary maintenance work on the overhead crane machinery. Genesi intervened by installing appropriate anchorage points and lifelines at the paths.

genesi